Skip to content
contact@solarmastersbd.com

Sector 16, Jolshiri Abashon, Purbachal, Dhaka

Saturday – Thursday, 10:00 – 18:00

Solar EPC Β· Bangladesh Β· Est. 2022

Your roof is the cheapest power plant you will ever build.

Solar Masters Bangladesh Limited engineers, installs and maintains solar generation for homes, factories, the grid and the field β€” sized to your actual load, documented properly, and built to outlast the warranty.

  • Own engineering team
  • Net-metering handled
  • 25-year module warranty
Utility-scale solar array in Bangladesh

Daily solar resource

4–5 kWh

per mΒ², per day, across most of Bangladesh

4–6years

Typical payback on a residential rooftop

70%

Of sanctioned load permitted under net metering

25years

Performance warranty on every module we fit

1,400kWh

Generated per kWp per year in Bangladesh

We interconnect with every distribution utility & programme in Bangladesh

DPDC DESCO BPDB BREB WZPDCL NESCO SREDA IDCOL
Solar Masters engineers surveying a rooftop installation

Scope of work

EPC

Engineering, procurement & construction β€” one accountable team

Who we are

An engineering company
that happens to sell solar.

Solar Masters Bangladesh Limited was formed to do one thing properly: convert the sunlight already falling on this country’s roofs and fields into electricity its owners can rely on.

We are not a reseller. Every system we deliver is surveyed, modelled, structurally assessed and commissioned by our own team β€” from a three-kilowatt array on a Dhaka rooftop to a megawatt-scale installation on a factory shed.

Bangladesh receives among the strongest solar resources in South Asia. Almost none of it is captured. That gap is the entire reason this company exists.

More about us

Before you call anyone

Find out roughly what
your roof is worth.

Most solar conversations start with a vendor’s number. Start with your own instead β€” then judge every quotation you receive against it.

Estimator

Size your system

Move the sliders to your actual bill and tariff. This is an indicative model, not a quotation β€” a real proposal follows a roof survey.

Property type

Assumes ~1,400 kWh/kWp/yr, unshaded roof, ~ΰ§³78/Wp installed. Your figures will differ.

Indicative result

System size
Annual generation
estimated, year one
Monthly saving
Indicative payback

Avoids roughly of COβ‚‚ per year β€” about trees’ worth of annual absorption.

Get this quoted properly

How we work

Four commitments we
will not trade away.

01

We size to your load, not to your roof

The cheapest capacity is the capacity you never buy. We read twelve months of bills and build the array around your actual consumption curve β€” not around whatever fits the available area.

02

The structure has to outlive the panels

Hot-dip galvanised or aluminium, specified against site wind exposure. Painted mild steel wins quotations and fails in year four. We do not offer it.

03

We handle the utility, not just the hardware

Net-metering applications, single-line diagrams, test certificates, inspection attendance and meter changeover are part of the installation β€” not an afterthought you chase alone.

04

You get the paperwork on handover day

Serial numbers, commissioning report, as-built diagrams, warranty certificates. A warranty you cannot document is a warranty you cannot claim.

Common questions

Straight
answers.

Not covered here? Ask us directly β€” we would rather answer a hard question early than a complaint later.

It depends on size, roof type and equipment, but a useful benchmark for a well-specified grid-tied system in Bangladesh is roughly ΰ§³70–90 per installed watt-peak. A 5 kWp residential system therefore lands in a broad band around ΰ§³350,000–450,000. We give an itemised figure after a roof survey β€” never before.

A residential rooftop is typically two to five days on site. Industrial systems run from a few weeks to a few months depending on capacity. Net-metering approval runs in parallel and takes four to ten weeks from filing.

Through the monsoon, yes β€” output falls to roughly 30–50% on heavily overcast days but does not stop, and net-metering credit from the dry season offsets the shortfall. During an outage, a grid-tied system without batteries shuts down for safety; add battery backup if you need essential circuits to stay live.

Yes. We install nationwide β€” rooftop and industrial work across the major cities and industrial belts, and solar irrigation in agricultural districts. Travel and logistics are quoted transparently as separate line items.

Very little. Periodic panel cleaning during the dry season, an annual inspection of mounting, terminations and inverter, and monitoring you can check from your phone. We offer annual O&M contracts for industrial sites with performance reporting.

Start here

Send us last month’s bill.
We’ll send back the numbers.

Flat B2, House 010, Road 505B, Sector 16, Jolshiri Abashon, Purbachal, Dhaka, Bangladesh